Skip to content
WHAT WE BUILD PROJECTS MONITORING KNOWLEDGE ABOUT US CONFIGURATOR CONTACT
Tensile membrane canopy over a playground
Back to what we build

WHAT WE BUILD

Playground canopies

Tensile membrane playground canopies — sun and rain protection

Request a quote

About playground canopies?

Tensile membrane playground canopies protect children from UV radiation, rain and overheating play equipment. We use lightweight structures with PVC membranes or HDPE shade fabrics that let air through for ventilation. Our canopies meet playground safety standards and are weather-resistant.

Material

PVC / HDPE

UV protection

up to 95%

Standards

EN 1176

Service life

15–25 years

Key advantages

UV protection

Membranes block up to 95% of UV radiation, protecting children from sunburn and reducing heat build-up on play equipment.

Safety

Structures meet playground safety standards. No sharp edges, fixings out of children's reach, non-flammable materials.

Durability and looks

Coloured membranes liven up the playground. UV- and weather-resistant materials keep the look fresh for years.

Applications

Which playgrounds we cover

Municipal playgrounds
Kindergarten playgrounds
Housing-estate playgrounds
Parks and squares
Shopping centres
Hotel playgrounds

Playground shading — what the new Polish rules say

In Poland, the draft of the new regulation on the technical conditions for buildings and their location (version of 24 April 2026, § 33(4)) provides that a children's playground must have seasonal shading elements — from 1 May to 30 September — covering at least 20% of its area. They are not required where natural shade, e.g. from trees, covers that area.

Status as of September 2026: the regulation is awaiting publication in the Polish Journal of Laws (Dziennik Ustaw). Until then it is a draft, not a binding rule.

The same requirement — seasonal shade over at least 20% of the playground from 1 May to 30 September — is part of the guidelines of the Polish government programme "Aktywne Place Zabaw" 2026 for playgrounds at nurseries and children's clubs.

We design, supply and install seasonal shade sails and permanent membrane canopies. We size the cover so that the shade reaches the required 20% of the playground while keeping the safety zones of the equipment clear.

min. 20%

of the playground area in shade

1 May – 30 Sep

seasonal shading period

§ 33(4)

of the draft Polish regulation on technical conditions (24 April 2026)

Frequently asked questions

Does a playground in Poland need shading?
The draft of the new Polish regulation on technical conditions for buildings (version of 24 April 2026, § 33(4)) provides for seasonal shade over at least 20% of a children's playground. In September 2026 the regulation was still awaiting publication in the Journal of Laws. The Polish programme "Aktywne Place Zabaw" 2026 already sets the same requirement for playgrounds at nurseries and children's clubs.
Who does the shading requirement apply to?
The draft covers playgrounds required next to buildings — mainly when new multi-family residential buildings are built (§ 33(1) of the draft). It therefore concerns mostly investors and developers. In the "Aktywne Place Zabaw" programme it applies to nurseries and children's clubs that receive funding.
Since when does the shading requirement apply?
In the "Aktywne Place Zabaw" programme — from the 2026 edition. Under the technical-conditions regulation — from its entry into force; in September 2026 it was awaiting publication, and the draft contains transitional rules for projects started earlier. Within the year, shade is required from 1 May to 30 September.
How much of the playground must be shaded?
At least 20% of the playground area. Shading elements are not required where natural shade, e.g. from trees, covers that area.
Which solutions meet the shading requirement?
The draft speaks of seasonal shading elements, so covers installed for the season, such as HDPE or PVC shade sails, are enough. A permanent membrane canopy, which also protects from rain, works as well. Abastran designs, supplies and installs both.

Let's talk about your project

Planning a playground canopy? Get in touch — we'll design a safe and attractive solution.