Skip to content
WHAT WE BUILD PROJECTS MONITORING KNOWLEDGE ABOUT US CONFIGURATOR CONTACT
Structural monitoring of the stadium roof in Sosnowiec
Back to projects

Completed 2023

Structural monitoring of the stadium roof in Sosnowiec

Sosnowiec, Poland

Steel structure
Structural monitoring Stadium canopies
Monitoring
Request a quote

Description

Structure

Zagłębiowski Park Sportowy in Sosnowiec is a modern football stadium with a stand roof made of sheet metal on a steel truss structure. The facility is in daily use — monitoring operates continuously during stadium operation.

Challenge

The building project required structural monitoring of the roof. Commissioned by Carbo Automatyka — a subcontractor to the general contractor (Bielskie Przedsiębiorstwo Budownictwa Przemysłowego S.A.) — we designed and implemented an extended monitoring system covering full diagnostics of the steel structure.

Key requirements:

  • Continuous measurement of structural loads, including snow and wind loads
  • Monitoring of deformations and displacements of truss girders
  • Monitoring of column tilts and foundation settlement
  • Integration with the existing stadium BMS
  • Online data view with automatic safety alerts

Solution

Measurement infrastructure

The system comprises over 70 measurement points distributed across 5 roof sections, monitoring truss girders (including DZ-2, DZ-9, DZ-10, DZ-15, DZ-19) and the boiler building.

Seven sensor types were installed:

  • Strain gauges (O) — 16 sensors measuring steel structure stresses [MPa]
  • Temperature sensors (T) — 16 steel surface temperature sensors for temperature compensation
  • Inclinometers (I) — 14 dual-axis tilt sensors monitoring column and joint geometry
  • Accelerometers (A) — 12 three-axis acceleration sensors for structural vibration analysis
  • Displacement sensors (P) — 8 sensors measuring structural element displacements
  • Snow mass sensors (S) — 5 roof snow load sensors [kg/m²]
  • Hydroleveller (H) — foundation settlement sensor

Additionally, a weather station was installed measuring air temperature, humidity, dew point, wind speed and direction.

Platform and integration

Sensor readings refresh every five seconds. Each measurement point has defined alarm thresholds — displacement sensors display real-time safety status.

The monitoring system was integrated with the local stadium BMS via the Modbus TCP protocol, allowing facility technical staff to access monitoring data directly from the building management system.

Results

  • Continuous 24/7 monitoring of the roof structure condition
  • Automatic alerts when safety thresholds are exceeded
  • Full integration with the building management system (BMS)
  • Structural condition documentation for periodic inspections
  • Safe facility operation with continuous load monitoring

Client

Abastran Sp. z o.o.

Location

Sosnowiec, Poland

Status

Completed 2023

General contractor

Carbo Automatyka

Scope of work

Design and delivery of the monitoring system

Gallery

6 photo

Let's talk about your project

Discover our innovative tensile membrane solutions, ETFE structures, steelwork and air domes — built to perform.