Logo UE
Logo Abastran

Membrane roofing of the stands of the MOSiR stadium in Sieradz

Dodatkowe treści

Year: 2018

Location: Sieradz, Poland

Area: 530 m2

Material: easyASM 84+ PVC membrane

Construction: Abastran Sp. z o. o.

General contractor: GRAFIT Sp. z o. o.

Scope: design, membrane installation

 

In 2018, a modern membrane roof was built at the stadium of the Municipal Sports and Recreation Center in Sieradz, which is one of the elements of the reconstruction of this sports facility. The project aimed to create effective protection for spectators against unfavorable weather conditions, which increases the functionality of the stadium and the comfort of using it during various sports events.

 

The roof was made using the easyASM 84+ PVC membrane, which is a material with high resistance to tears, UV and other atmospheric factors. The roof structure is based on bent steel pipes that form arched frames, and the whole structure is rigidly attached to the stadium structure. The membrane is tensioned using gusset plates and tensioning screws, which ensures its stability and aesthetic appearance. The roof is approximately 57 m long, approximately 12 m wide, and its maximum height is 8.5 m from the grass level.

Galeria

FAQ

What materials were used to make the roof?